We’ve moved! After a 5-month remodel of a very old and crappy building interior, we’ve finally moved into our new home. Josh (our CEO) was involved every step of the way (because he loves that sort of thing).
BEFORE
DURING
Josh completely gutted the existing interior and built a new loft, redid the floor, added new insulation, an epic massive ceiling fan, two bathrooms, aluminum tumbling room, conference room, and a dozen other things. It was a great opportunity to test out some of our new gear and get ideas for improvements. Nothing beats using your own gear when it comes to design inspiration!
AFTER
This new building is roughly twice the size (10K sq. ft.) of our old facility and now much nicer! We added a 3rd CNC machine and continue to improve our lean manufacturing processes (kaizen). We also have a garage door big enough for a combine (just in case)!